Title: CAD DESIGN MANUAL UPDATE FOR 3D DESIGN, PROJECT NO. PS21-05
Sponsors: Kathy Millea
Attachments: 1. Agenda Report, 2. PS21-05 Professional Services Agreement, 3. PS21-05 PSA Attachment A - Scope of Work
Related files: 2022-2526

FROM:                     Robert Thompson, General Manager

                     Originator: Kathy Millea, Director of Engineering 

 

SUBJECT:

 

title

CAD DESIGN MANUAL UPDATE FOR 3D DESIGN, PROJECT NO. PS21-05

end

 

GENERAL MANAGER'S RECOMMENDATION

 

recommendation

RECOMMENDATION: 

A.       Approve a Professional Services Agreement with The Austin Company to provide support services for CAD Design Manual Update for 3D Design, Project No. PS21-05, for a total amount not to exceed $416,000; and

 

B.       Approve a contingency of $41,600 (10%).

body

 

BACKGROUND

 

Orange County Sanitation District (OC San) projects utilize computer-aided design (CAD) software to develop design drawings.  These drawings are developed in accordance with OC San’s published CAD standards.  The current standards are based on two dimensional designs, which were previously the industry standard.

 

RELEVANT STANDARDS

 

                     Maintain a culture of improving efficiency to reduce the cost to provide the current service level or standard

                     Sustain 1, 5, 20-year planning horizons

 

PROBLEM

 

OC San’s current CAD standards are not applicable for 3D designs, which are becoming increasingly common.  OC San’s consultants are currently preparing 3D design documents based on their own design standards, which causes inconsistencies between design drawings developed by different consultants and creates additional work by OC San staff to gain CAD compliance.

 

PROPOSED SOLUTION

 

Approve a professional services agreement for CAD Design Manual Update for 3D Design, Project No. PS21-05.  This project will develop 3D CAD design standards that follow general industry guidelines, integrate these standards into OC San’s current CAD Standards Manual, create automated quality control tools for 3D CAD compliance verification, identify 3D applications that may benefit OC San in the future within the environment of OC San’s GIS database, and provide training to OC San CAD staff to perform quality control for CAD compliance.

 

TIMING CONCERNS

 

OC San projects using 3D design will continue to rely on consultant’s internal standards, which are inconsistent with one another, until OC San 3D CAD standards are published.

 

RAMIFICATIONS OF NOT TAKING ACTION

 

OC San projects will continue to be inconsistent with 3D design standards.

 

PRIOR COMMITTEE/BOARD ACTIONS

 

N/A

 

ADDITIONAL INFORMATION

 

Consultant Selection:

 

OC San requested and advertised for proposals for CAD Design Manual Update for 3D Design, Project No. PS21-05 on July 21, 2022.  The following evaluation criteria were described in the Request for Proposals (RFP) and used to determine the most qualified Consultant.

 

CRITERION

WEIGHT

Project Understanding and Approach

40%

Related Project Experience

30%

Project Team and Staff Qualifications

30%

 

Two proposals were received on October 4, 2022 and evaluated in accordance with the evaluation process set forth in OC San’s Purchasing Ordinance by a pre-selected Evaluation Team consisting of the following OC San staff:  Senior Engineer (Project Engineer), Information Technology Manager, and Senior Engineer (Project Manager).  The Evaluation Team also included two non-voting representatives:  one Supplemental Engineering Services contract employee and one representative from the Contracts Administration Division.

 

The Evaluation Team scored the two proposals on the established criteria as summarized below:

 

Proposer

Project Understanding and Approach (Max. 40 Points)

Related Project Experience (Max. 30 Points)

Project Team and Staff Qualifications (Max. 30 Points)

 Total Score (Max. 100 Points)

The Austin Company

27

20

18

65

Next Stage Group

23

20

15

58

Both Consultants were shortlisted for interviews on November 8, 2022.  Following the interview, each member of the Evaluation Team scored the Consultants based on both the proposals and interviews using the evaluation criteria and weighting described above.  Based on the scoring shown below, The Austin Company was selected as the most qualified Consultant.

 

Proposer

Project Understanding and Approach (Max. 40 Points)

Related Project Experience (Max. 30 Points)

Project Team and Staff Qualifications (Max. 30 Points)

 Total Score (Max. 100 Points)

The Austin Company

33

23

24

80

Next Stage Group

12

10

10

32

 

The selected proposer provided a detailed work execution schedule that showcased their understanding of OC San’s project goals of clear 3D CAD standards and an updated 3D CAD manual.  The selected proposer also identified areas where the schedule can be improved to create more time for stakeholder workshops.  The project manager of the proposed team is the firm’s Building Information Management (BIM) Manager to bring their expertise in executing 3D CAD projects.  The team also includes engineers from multiple disciplines who bring experience in executing 3D CAD compliance.  The selected proposer included two subconsultants to ensure a successful project.  The first provides additional experience in creating similar 3D CAD standards for other agencies and the second specializes in training, which will be critical for a successful rollout of the updated CAD Manual.

 

Review of Fee Proposal and Negotiations:

 

Proposals were accompanied by sealed fee proposals.  In accordance with the Purchasing Ordinance, the fee proposal of only the highest-ranked firm was opened after approval by the Director of Engineering of the Evaluation Committee’s recommendation.

 

Staff conducted negotiations with The Austin Company to clarify the requirements of the Scope of Work, the assumptions used for the estimated level of effort, and the proposed approach to meet the goals and objectives for the project.  Starting on November 19, 2022, the Evaluation Team conducted negotiations.  The negotiated fee remained generally the same as the Scope of Work.  Changes listed below were already represented in the originally proposed labor hours and fees and were deemed fair and reasonable by OC San staff.  The table below summarizes the revised level of effort:

 

 

Original Fee Proposal

Negotiated Fee

Total Hours

2,316

2,316

Total Fee

$415,873

$416,000

 

The Austin Company proposed changes to the Scope of Work in their original proposal as listed below.  OC San staff accepted these changes as they were determined to benefit the delivery of the project.

                     Added additional reviews of completed OC San project CAD files to obtain a better understanding of the types of projects typical of OC San.

                     Mandated earlier project meetings to gain earlier consensus from stakeholders.

                     Required production of sample 3D model that will be used in both external and internal training sessions.

 

The Consultant’s fringe and overhead costs, which factor into the billing rate, have been substantiated.  The contract profit is 9.96%, which is based on an established formula based on OC San’s standard design agreements.  Staff is requesting a 10 percent contingency to address revisions as the project progresses through design.

 

Based on the above, staff has determined that the final negotiated fee is fair and reasonable for the level of effort required for this project and recommends award of the Professional Services Agreement to The Austin Company.

 

CEQA

 

This is not a project as defined by the California Environmental Quality Act (CEQA), therefore CEQA does not apply.

 

FINANCIAL CONSIDERATIONS

 

This request complies with the authority levels of OC San’s Purchasing Ordinance.  This item has been budgeted (Adopted Budget, Fiscal Years 2022-2023 and 2023-24, Section 8, Page 51, Planning Studies Program, Project No. M-STUDIES) and the budget is sufficient for the recommended action.

 

ATTACHMENT

The following attachment(s) may be viewed on-line at the OC San website (www.ocsan.gov) with the complete agenda package:

 

                     Professional Services Agreement

                     Professional Services Agreement Attachment A - Scope of Work

 