File #: 2020-1216    Version: 1 Name:
Type: Non-Consent Status: Passed
File created: 8/17/2020 In control: OPERATIONS COMMITTEE
On agenda: 9/1/2021 Final action: 9/1/2021
Title: EROSION CONTROL AT SANTA ANA RIVER AND HAMILTON AVE., PROJECT NO. FE18-12
Sponsors: Kathy Millea
Attachments: 1. Agenda Report, 2. FE18-12 Contract Agreement & Exhibit A (Schedule of Prices), 3. Presentation - Erosion Control SAR_Hamilton

FROM:                     James D. Herberg, General Manager

                     Originator: Kathy Millea, Director of Engineering 

 

SUBJECT:

 

title

EROSION CONTROL AT SANTA ANA RIVER AND HAMILTON AVE., PROJECT NO. FE18-12

end

 

GENERAL MANAGER'S RECOMMENDATION

 

recommendation

RECOMMENDATION: 

A.       Receive and file Bid Tabulation and Recommendation for Erosion Control at Santa Ana River and Hamilton Ave., Project No. FE18-12;

 

B.       Award a Construction Contract to Engineering & Environmental Construction, Inc. for Erosion Control at Santa Ana River and Hamilton Ave., Project No. FE18-12, for a total amount not to exceed $162,281; and

 

C.       Approve a contingency of $24,342 (15%).

 

body

BACKGROUND

 

The Orange County Sanitation District (OC San) has a valve vault installed near the Santa Ana River Trail just north of Hamilton Avenue, in the City of Huntington Beach.  The vault is located in an area that slopes down to a pedestrian entrance gate to a condominium complex.

 

RELEVANT STANDARDS

 

                     Comply with California Public Contract Code Section 20103.8, award construction contract to lowest responsive, responsible bidder

                     Operate and maintain facilities to minimize impacts on surrounding communities, including odor, noise, and lighting

 

PROBLEM

 

The slope between the valve vault and the pedestrian entrance erodes during rainstorms and the runoff deposits mud and sediment on the adjacent condominium parking lot.  Soil erosion will ultimately compromise the integrity of the vault.

 

 

 

PROPOSED SOLUTION

 

Award a construction contract for Erosion Control at Santa Ana River and Hamilton Avenue, Project No. FE18-12.  This project will repair, recompact, and install riprap to provide long-term protection to the slope around the vault.  This project also eliminates the need for recurring slope maintenance that is not completely effective at stopping soil erosion.

 

This project requires the excavation and compaction of soil around the valve vault.  Because of the relatively small contract value, and the cost to repair a single undisclosed utility can be high, staff recommends awarding a construction contract contingency of 15% rather than the usual 10%.

 

TIMING CONCERNS

 

Before the start of each rainy season, OC San staff must install straw waddles and other control measures to help prevent soil erosion around the vault.  Mud has been flowing into the condominium parking lot for several rainy seasons and should be dealt with as soon as possible.

 

RAMIFICATIONS OF NOT TAKING ACTION

 

Not stabilizing the slope next to the vault will lead to the vault being further exposed and possibly damaged and mud will continue to flow onto the parking lot each year.

 

PRIOR COMMITTEE/BOARD ACTIONS

 

N/A

 

ADDITIONAL INFORMATION

 

OC San advertised Project No. FE18-12 for bids on May 6, 2021.  One on-line bid was received on July 1, 2020.  A summary of the bid opening follows:

 

Engineer’s Estimate

$ 102,000

Bidder

UAmount of Bid

Engineering & Environmental Construction, Inc.

$162,281

 

The bid was evaluated in accordance with OC San’s policies and procedures.  A notice was sent to the bidder on July 29, 2021, informing them of the intent of OC San to recommend award of the Construction Contract to Engineering & Environmental Construction, Inc.

 

A post-bid survey was conducted with the nine firms on the Planholder’s list.  Six of the firms said they did not submit due to competing projects and priorities.  One firm declined due to safety and financial paperwork requirements, and another prefers to bid on unit price contracts.

 

At this point, changes could be made to rebid the project with the hope of getting more bidders.  That, however, would involve significantly more staff time and delay the work until after another wet season.  The additional staff costs and interim erosion control measures would likely offset savings from a more competitive bid environment.

 

Staff recommends awarding a construction contract to the lowest responsive and responsible bidder, Engineering & Environmental Construction, Inc., for a total amount not to exceed $162,281.

 

CEQA

 

The project is exempt from CEQA under the Class 1 categorical exemptions set forth in California Code of Regulations sections 15301.  A Notice of Exemption will be filed with the OC Clerk-Recorder after OC San’s Board of Directors approval of the construction contract.

 

FINANCIAL CONSIDERATIONS

 

This request complies with the authority levels of OC San’s Purchasing Ordinance.  This item has been budgeted (Budget Update, Fiscal Year 2021-2022, Appendix A, Page A-8, Small Construction Projects Program, Project No. M-FE) and the budget is sufficient for the recommended action.

 