Title: COLLEGE PUMP STATION WET WELL REHABILITATION, PROJECT NO. FRC-0020
Sponsors: Mike Dorman
Attachments: 1. Agenda Report, 2. Construction Contract, 3. Presentation

FROM:                     Robert Thompson, General Manager

                     Originator: Mike Dorman, Director of Engineering 

 

SUBJECT:

 

title

COLLEGE PUMP STATION WET WELL REHABILITATION, PROJECT NO. FRC-0020

end

 

GENERAL MANAGER'S RECOMMENDATION

 

recommendation

RECOMMENDATION:  Recommend to the Board of Directors to:

A.       Find that proposed actions are categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301;

 

B.       Receive and file Bid Tabulation and Recommendation for College Pump Station Wet Well Rehabilitation, Project No. FRC-0020;

 

C.       Award a Construction Contract to T.E. Roberts, Inc., for College Pump Station Wet Well Rehabilitation, Project No. FRC-0020, for a total amount not to exceed $4,727,161; and

 

D.       Approve a contingency of $709,074 (15%).

body

 

BACKGROUND

 

The Orange County Sanitation District (OC San) operates College Pump Station to convey wastewater through its collection system.  The station uses a wet well to collect wastewater before it is pumped through the system.

 

RELEVANT STANDARDS

 

•                     Comply with California Public Contract Code Section 20103.8, award construction contract to lowest responsive, responsible bidder

•                     Ensure the public’s money is wisely spent

•                     Sound engineering and accounting practices, complying with local, state and federal laws

 

PROBLEM

 

The concrete surfaces and protective lining in the College Pump Station wet well have deteriorated and require repair.  Rehabilitation cannot be performed while wastewater is flowing through the wet well, and the pump station must continue operating throughout construction.

 

PROPOSED SOLUTION

 

Award a construction contract to rehabilitate the College Pump Station wet well.  The contractor will provide temporary bypass pumping to maintain wastewater service while repairing deteriorated concrete and applying a new protective lining.  These improvements will help maintain reliable pump station operations.

 

TIMING CONCERNS

 

Delaying the rehabilitation may lead to further deterioration and could require more extensive repairs and higher costs in the future.

 

RAMIFICATIONS OF NOT TAKING ACTION

 

Without a contract award, the deteriorated wet well would remain unrepaired, potentially increasing the risk of unplanned maintenance and disruptions to pump station operations.

 

PRIOR COMMITTEE/BOARD ACTIONS

 

N/A

 

ADDITIONAL INFORMATION

 

OC San received four bids for College Pump Station Wet Well Rehabilitation, Project No. FRC-0020, which were opened on September 22, 2026.  A summary of bid information follows:

 

Engineer’s Estimate

$7,540,000

Bidder

Amount of Bid

Innovative Construction Solutions (ICS)

$3,725,700

T.E. Roberts, Inc.

$4,727,161

Charles King Construction

$4,892,200

Steve P. Rados, Inc.

$6,448,000

 

The bids were evaluated in accordance with OC San policies and procedures, including review of bidder qualifications and project experience.  On November 18, 2026, OC San notified all bidders that staff intended to recommend award of the Construction Contract to T.E. Roberts, Inc.

 

Innovative Construction Solutions (ICS) submitted the lowest bid at $3,725,700.  OC San reviewed the four projects ICS listed to demonstrate its experience, requested additional information, and verified references with the project owners.  Staff determined that those projects did not demonstrate the required experience.  OC San found the bid non-responsive, and Legal Counsel concurred.

 

T.E. Roberts, Inc., submitted the second-lowest bid at $4,727,161.  OC San reviewed seven submitted projects and contacted project owners to verify relevant experience.  Staff determined that the projects demonstrated the required experience.  OC San found T.E. Roberts, Inc., to be the lowest responsive and responsible bidder.

 

T.E. Roberts Inc.’s, bid is $2,812,839 (37%) below the $7,540,000 Engineer’s Estimate.  The difference consists of approximately $1.11 million (39%) in direct construction cost differences, temporary bypassing, $1.19 million (42%) in market volatility adjustments, and $0.51 million (19%) in estimating allowances.  The largest direct construction cost differences involve temporary bypassing, traffic control, and roadway restoration.

 

Based on the bids received and the cost differences identified during the review, staff considers T.E. Roberts, Inc.'s, bid reasonable.

 

Staff recommends a 15% construction contingency, rather than the standard 10% to account for potential unforeseen conditions.  The full extent of concrete deterioration may not be apparent until the wet well is taken out of service and the existing coating is removed.  Additional concrete repairs may extend the duration of temporary bypass pumping and increase construction costs.  The higher contingency provides additional funding to address the potential unforeseen conditions and associated costs.

 

Staff recommends award of the Construction Contract to the lowest responsive and responsible bidder, T.E. Roberts, Inc., for a total amount not to exceed $4,727,161.

 

CEQA

 

The project is exempt from CEQA under the Class 1 categorical exemptions set forth in California Code of Regulations section 15301.  A Notice of Exemption will be filed with the Orange County Clerk-Recorder and posted on the State Clearinghouse website after the OC San’s Board of Directors approval of the Construction Contract.

 

FINANCIAL CONSIDERATIONS

 

This request complies with the authority levels of OC San’s Purchasing Ordinance.  This recommendation will be funded under the Repairs and Maintenance line item for the Operations and Maintenance Department (Budget FY 2026-27 and 2027-28, Section 4, Page 3) and the available funding is sufficient for this action.

 

ATTACHMENT

The following attachment(s) may be viewed on-line at the OC San website (www.ocsan.gov) with the complete agenda package:

 

•                     Construction Contract

•                     Presentation

 

 

HO:lb