File #: 2021-1803    Version: 1 Name:
Type: Consent Status: Passed
File created: 8/10/2021 In control: OPERATIONS COMMITTEE
On agenda: 9/1/2021 Final action: 9/1/2021
Title: PURCHASE OF BAR SCREEN DRIVE SHAFT ASSEMBLY FOR PLANT NO. 2
Sponsors: Rob Thompson
Attachments: 1. Agenda Report

FROM:                     James D. Herberg, General Manager

                     Originator: Rob Thompson, Assistant General Manager 

 

SUBJECT:

 

title

PURCHASE OF BAR SCREEN DRIVE SHAFT ASSEMBLY FOR PLANT NO. 2

end

 

GENERAL MANAGER'S RECOMMENDATION

 

recommendation

RECOMMENDATION: 

A.       Approve a Sole Source Purchase Order with Infilco Degremont Inc. for the purchase of one spare drive shaft assembly for Plant No. 2 Bar Screening Facility, Model 316SS, for a total amount not to exceed $96,771 plus applicable sales tax & freight charges; and

 

B.       Approve a contingency of $4,839 (5%).

body

 

BACKGROUND

 

The Orange County Sanitation District (OC San) Headworks at Plant No. 2 uses six bar screen assemblies to provide screening removal of solids and other non-biodegradables from influent wastewater.  The bar screens are designed for protection of downstream equipment and efficient treatment.  As unfiltered wastewater passes through a bar screen, debris collects on the steel bars.  A mechanical rake removes large objects such as rags, trash, wood, and other debris from the bars and allows the influent wastewater to enter the Headworks for further treatment.

 

RELEVANT STANDARDS

 

                     24/7/365 treatment plant reliability

                     Maintain a proactive asset management program

                     Operate and maintain facilities to minimize impacts on surrounding communities, including odor, noise, and lighting

 

PROBLEM

 

Bar screens are critical assets to the wastewater treatment process.  Due to the nature of the equipment, bar screen failures can be unpredictable.  The lead time for purchasing a new main drive gear assembly exceeds 12 weeks as it is not an off-the-shelf item. 

 

 

 

PROPOSED SOLUTION

 

Procure a spare drive shaft assembly from the Original Equipment Manufacturer (OEM), Infilco Degremont Inc., which is compatible with all six Plant No. 2 bar screens.  In the event of catastrophic failure of a gearbox, adding a spare unit to OC San’s inventory will reduce the risk of significant downtime and equipment unavailability for these critical assets.

 

TIMING CONCERNS

 

N/A

 

RAMIFICATIONS OF NOT TAKING ACTION

 

Failure to maintain adequate spare parts in inventory could result in extended equipment downtime affecting operational permits.

 

PRIOR COMMITTEE/BOARD ACTIONS

 

N/A

 

ADDITIONAL INFORMATION

 

Infilco Degremont Inc. is the OEM and is a subsidiary of Suez Treatment Solutions Inc.  A 5% contingency is requested in the event of pricing changes due to tariffs, delays in placing the order beyond the quote availability, or other unforeseeable changes.

 

CEQA

 

N/A

 

FINANCIAL CONSIDERATIONS

 

This request complies with authority levels of OC San’s Purchasing Ordinance.  This recommendation will be funded under the Repairs and Maintenance line item for Plant No. 2 Operations and Maintenance Department (Budget Update - Fiscal Year 2021-2022, Page 45).  The available funding is sufficient for this action.

 

Date of Approval

         Contract Amount

               Contingency

      09/01/2021

               $96,771

                     $4,839

 

ATTACHMENT

The following attachment(s) may be viewed on-line at the OC San website (www.ocsan.gov) with the complete agenda package:

 

N/A