Title: PLANT NO. 1 SPARE MAIN SEWAGE PUMP
Sponsors: Riaz Moinuddin
Attachments: 1. Agenda Report
Related files: 2020-1084

FROM:                     Robert Thompson, General Manager

                     Originator: Riaz Moinuddin, Director of Operations & Maintenance 

 

SUBJECT:

 

title

PLANT NO. 1 SPARE MAIN SEWAGE PUMP

end

 

GENERAL MANAGER'S RECOMMENDATION

 

recommendation

RECOMMENDATION:  Recommend to the Board of Directors to:

A.       Approve a Sole Source Purchase Order to DXP Enterprises, Inc., dba CorTech Engineering LLC, for one spare Flowserve Main Sewage Pump  for a total amount not to exceed $698,300; and

 

B.       Approve a contingency of 10% ($69,800).

body

 

BACKGROUND

 

The Main Sewage Pumps (MSPs) at Orange County Sanitation District’s (OC San) Plant No. 1 are critical to wastewater treatment operations. These pumps convey incoming wastewater from the collection system through the headworks to downstream treatment processes. Reliable operation of the MSPs is essential to maintain wastewater conveyance capacity, accommodating variations in incoming flows, and providing sufficient pumping capacity during peak flow conditions.

 

Project No. P1-105, Headworks Rehabilitation at Plant No. 1, is currently underway and plans to install five new MSPs during the next dry weather season. The project includes spare parts for the new pumps but does not provide a complete, ready-to-install spare pump assembly. Due to the pumps' critical function, specialized design, and importance to plant operations, maintaining a complete spare MSP is essential to minimizing extended equipment outages and preserving wastewater conveyance capacity.

 

 

RELEVANT STANDARDS

 

•                     24/7/365 treatment plant reliability

•                     Protect OC San Assets

•                     Protect public safety

•                     Maintain a proactive asset management program

 

 

 

PROBLEM

 

Project No. P1-105 will provide spare parts for the five new MSPs but does not include a complete, ready-to-install spare pump assembly. OC San does not have a compatible spare MSP available on-site, and the existing MSPs will not be directly interchangeable with the new pumps.

 

While the spare parts provided under the project will support routine maintenance and certain equipment repairs, they will not provide a complete replacement pump that can be readily swapped into service following a major equipment failure.

 

Without a complete spare MSP, a major pump failure could result in an extended equipment outage while repairs are performed or a replacement pump is manufactured and delivered. This would reduce available pumping capacity, limit operational flexibility, and increase the risk of wastewater conveyance and treatment interruptions, particularly during peak flow conditions.

 

PROPOSED SOLUTION

 

Purchase one spare Flowserve MSP through DXP Enterprises, Inc., dba CorTech Engineering LLC, the authorized representative for Flowserve products in California. Maintaining a compatible spare on-site will allow OC San to respond more quickly to a major pump failure, reduce equipment downtime, and maintain reliable wastewater conveyance and treatment operations.

 

 

TIMING CONCERNS

 

The spare MSP has an estimated procurement lead time of 40 weeks from placement of the order. Delaying the purchase would extend the period during which OC San operates without a compatible spare, increasing the risk of prolonged equipment downtime in the event of a major pump failure.

 

 

RAMIFICATIONS OF NOT TAKING ACTION

 

Without a spare MSP, a major pump failure could result in an extended reduction in pumping capacity while a replacement is procured. This could compromise operational reliability, limit the plant's ability to accommodate peak wastewater flows, and increase the risk of treatment interruptions and regulatory noncompliance.

 

PRIOR COMMITTEE/BOARD ACTIONS

 

May 2020 - Approved Flowserve as an Original Equipment Manufacturer (OEM) Sole Source provider for pumps and parts.

 

ADDITIONAL INFORMATION

 

Flowserve is the Board-approved OEM Sole Source.  DXP Enterprises, Inc., dba CorTech Engineering LLC, is the sole authorized representative for Flowserve products in California.

 

CEQA

 

N/A

 

FINANCIAL CONSIDERATIONS

 

This request complies with authority levels of OC San’s Purchasing Ordinance. This item has been budgeted (Budget FY2026-27 and 2027-28, Section 8, Page 82 and 86, Plant No. 1 Maintenance), and the budget is sufficient for the recommended action.

 

Date of Approval

Contract Amount

Contingency

11/18/2026

$698,300

$69,800

 

ATTACHMENT

The following attachment(s) may be viewed on-line at the OC San website (www.ocsan.gov) with the complete agenda package:

 

N/A