File #: 2025-4176    Version: 1 Name:
Type: Consent Status: Passed
File created: 3/11/2025 In control: OPERATIONS COMMITTEE
On agenda: 10/1/2025 Final action: 10/1/2025
Title: PIPELINE UTILITY EASEMENT CLEAN UP IN HUNTINGTON BEACH, PROJECT NO. FE23-07
Sponsors: Mike Dorman
Attachments: 1. Agenda Report, 2. Construction Contract
Related files: 2025-4546

FROM:                     Robert Thompson, General Manager

                     Originator: Mike Dorman, Director of Engineering 

 

SUBJECT:

 

title

PIPELINE UTILITY EASEMENT CLEAN UP IN HUNTINGTON BEACH, PROJECT NO. FE23-07

end

 

GENERAL MANAGER'S RECOMMENDATION

 

recommendation

RECOMMENDATION:  Recommend to the Board of Directors to:

A.       Receive and file Bid Tabulation and Recommendation for Pipeline Utility     Easement Clean Up in Huntington Beach, Project No. FE23-07;

 

B.       Award a Construction Contract to Metrocell Construction, Inc., for Pipeline Utility Easement Clean Up in Huntington Beach, Project No. FE23-07, for a total amount not to exceed $2,863,255; and

 

C.       Approve a contingency of $286,326 (10%).

body

 

BACKGROUND

 

The Orange County Sanitation District (OC San) has a 66-inch diameter pipeline within a 30-foot-wide utility easement constructed in 1959, before the adjacent private properties were constructed.  Private property encroachments have occurred across the sewer easement, including structures, sheds, pools, fencing, and landscaping behind 29 private properties.

 

RELEVANT STANDARDS

 

                     Comply with California Public Contract Code Section 20103.8, award construction contract to lowest responsive, responsible bidder

                     Commitment to safety and reducing risks in all operations

                     Operate and maintain facilities to minimize impacts on surrounding communities, including odor, noise, and lighting

 

PROBLEM

 

Private property encroachments obstruct required access to sewer facilities, preventing OC San from conducting assessments, maintenance, and repairs. These access restrictions pose a significant risk, as urgent repairs may be delayed or prevented altogether, potentially impacting system reliability and public health.

 

PROPOSED SOLUTION

 

Award a construction contract to restore critical access to the sewer main by removing encroachments on 13 private properties within OC San’s pipeline easement.  Work will include demolishing landscaping and an existing wall, resurfacing easement areas, constructing block walls and a drainage swale, and installing access gates as needed to ensure long-term accessibility for OC San.

 

TIMING CONCERNS

 

OC San will continue to face difficulties accessing its sewer facilities and performing assessments, maintenance, and repairs.

 

RAMIFICATIONS OF NOT TAKING ACTION

 

Failure to restore access could result in significant service disruptions to the community if the pipeline were to fail, since OC San staff would not be able to respond promptly with necessary maintenance or repairs.

 

PRIOR COMMITTEE/BOARD ACTIONS

 

N/A

 

ADDITIONAL INFORMATION

 

OC San advertised Project No. FE23-07 for bids on June 30, 2025, and three sealed bids were received on August 14, 2025.  A summary of the bid opening follows:

 

Engineer’s Estimate

$3,302,000

Bidder

Amount of Bid

Metrocell Construction, Inc.

$2,863,255

MMC, Inc.

$3,154,000

Lonerock, Inc.

$4,531,250

 

The bids were evaluated in accordance with OC San’s policies and procedures.  A notice was sent to all bidders on September 2, 2025, informing them of the intent to recommend awarding the Construction Contract to Metrocell Construction, Inc.

 

Staff recommends awarding a Construction Contract to the lowest responsive and responsible bidder, Metrocell Construction, Inc., for a total amount not to exceed $2,863,255.

 

CEQA

 

The project is exempt from CEQA under the Class 2 and 5 categorical exemptions set forth in the California Code of Regulations sections 15302 and 15305.  A Notice of Exemption will be filed with the OC Clerk-Recorder and State Clearinghouse after OC San's Board of Directors approval of the Construction Contract.

 

FINANCIAL CONSIDERATIONS

 

This request complies with the authority levels of OC San’s Purchasing Ordinance.  This item has been budgeted (Budget FY 2025-26, Page A-8, Small Construction Projects Program, Project No. M-FE) and the budget is sufficient for the recommended action.

 