Legislation Details

File #: 2026-5202    Version: 1 Name:
Type: Consent Status: Final
File created: 11/12/2026 In control: OPERATIONS COMMITTEE
On agenda: 12/2/2026 Final action:
Title: PLANT NO. 2 SPARE MAIN SEWAGE PUMP
Sponsors: Riaz Moinuddin
Attachments: 1. Agenda Report
Related files: 2020-943

FROM:                     Robert Thompson, General Manager

                     Originator: Riaz Moinuddin, Director of Operations & Maintenance 

 

SUBJECT:

 

title

PLANT NO. 2 SPARE MAIN SEWAGE PUMP

end

 

GENERAL MANAGER'S RECOMMENDATION

 

recommendation

RECOMMENDATION:  Recommend to the Board of Directors to:

A.       Approve a Sole Source Purchase Order to DXP Enterprises, Inc., dba CorTech Engineering, LLC for one spare Patterson Main Sewage Pump (MSP) for a total amount not to exceed $393,163; and

 

B.       Approve a contingency of $39,316 (10%).

body

 

BACKGROUND

 

Orange County Sanitation District (OC San) Plant No. 2 operates seven Main Sewage Pumps (MSPs) that convey incoming wastewater from the collection system through the headworks to downstream treatment processes. MSPs 1 through 3 serve non-reclaimable flows, while MSPs 4 through 7 serve reclaimable flows. These pumps provide a combined maximum influent pumping capacity of 322 million gallons per day (MGD) and are essential to maintaining reliable wastewater conveyance and treatment operations.

 

RELEVANT STANDARDS

 

•                     24/7/365 treatment plant reliability

•                     Protect OC San assets

•                     Protect public safety

•                     Maintain a proactive asset management program

 

PROBLEM

 

OC San does not currently have a compatible spare MSP. The existing Patterson pumps cannot be overhauled by OC San and must be sent off-site for major repairs. A pump failure could therefore result in extended downtime, reduced pumping capacity, and increased risk of treatment interruptions, particularly during peak flow conditions.

 

 

PROPOSED SOLUTION

 

Procure one spare Patterson MSP through DXP Enterprises, Inc., dba CorTech Engineering, LLC, the manufacturer's authorized representative, to minimize equipment downtime and maintain influent pumping reliability.

 

TIMING CONCERNS

 

The spare MSP has an estimated 12-week procurement lead time. Delaying procurement increases the risk of prolonged equipment downtime and reduced pumping capacity should an existing pump fail.

 

RAMIFICATIONS OF NOT TAKING ACTION

 

Without an available spare, a major pump failure could result in prolonged equipment downtime, reduced influent pumping capacity, and increased risk of wastewater conveyance interruptions and regulatory noncompliance.

 

PRIOR COMMITTEE/BOARD ACTIONS

 

February 2020 - Approved Patterson as an OEM sole-source supplier.

 

ADDITIONAL INFORMATION

 

Patterson is a board-approved OEM sole source provided for Pumps and Parts. DXP Enterprises, Inc. dba CorTech Engineering LLC, is the sole authorized representative of Patterson products for California.

 

CEQA

 

N/A

 

FINANCIAL CONSIDERATIONS

 

This request complies with authority levels of OC San’s Purchasing Ordinance.  This item has been transferred from budgeted items Spare Plant 2 Truck loading Augers and Upgraded high torque motor and gearboxes only Putzmeister (Budget FY 2026-27, Section 8, Pages 82 and 87, 880-Plant No. 2 Maintenance) and the budget is sufficient for this action.

 

Date of Approval

Contract Amount

Contingency

12/16/2026

$393,163

$39,316

 

ATTACHMENT

The following attachment(s) may be viewed online at the OC San website (www.ocsan.gov) with the complete agenda package:

 

N/A