File #: 2022-2659    Version: 1 Name:
Type: Consent Status: Passed
File created: 11/30/2022 In control: STEERING COMMITTEE
On agenda: 12/15/2022 Final action: 12/15/2022
Title: GRANT OF EASEMENT TO SOUTHERN CALIFORNIA EDISON
Sponsors: Kelly Lore
Attachments: 1. Agenda Report, 2. SCE Easement, 3. SCE Facilities Relocation Agreement
Related files: 2022-2686, 2022-2068

FROM:                     James D. Herberg, General Manager

                     Originator: Kathy Millea, Director of Engineering 

 

SUBJECT:

 

title

GRANT OF EASEMENT TO SOUTHERN CALIFORNIA EDISON

end

 

GENERAL MANAGER'S RECOMMENDATION

 

recommendation

RECOMMENDATION:  Recommend to the Board of Directors to:

Authorize the Orange County Sanitation District to grant an easement to Southern California Edison (Document ID. TD1820057) for purposes of installation of underground electrical lines for the construction of the new pedestrian bridge to the Headquarters Complex at the corner of Ellis Avenue and Bandilier Circle in the City of Fountain Valley, APN No. 156-181-02, in a form approved by General Counsel.

body

 

BACKGROUND

 

Project P1-128A, Headquarters Complex at Plant No. 1, is constructing a new headquarters building across the street from Orange County Sanitation District (OC San) Plant No. 1.  The new building includes a new bridge to provide pedestrian access between the new headquarters and Plant No. 1.  The construction of this bridge requires Southern California Edison (SCE) electrical lines to be relocated from overhead utility poles to underground conduits.  This work will be performed by SCE under the terms of the Facilities Relocation Agreement between the two agencies that was previously approved by OC San’s Board of Directors.  OC San staff worked with SCE to determine the best option for routing the conduits underground and determined that although the conduit would be located along Ellis Avenue, a portion of a utility vault used to access these utilities will extend onto OC San's property by about three feet.  This utility vault will be outside the OC San perimeter wall on Ellis Avenue across from the intersection of Bandilier Circle.  The new underground lines require an easement to allow for SCE to access and maintain their utilities.

 

RELEVANT STANDARDS

 

                     Maintain collaborative and cooperative relationships with regulators, stakeholders, and neighboring communities

                     Operate and maintain facilities to minimize impacts on surrounding communities, including odor, noise, and lighting

 

 

 

PROBLEM

 

SCE must relocate their electrical lines underground in order for the new headquarters pedestrian bridge to be constructed.  There is inadequate space in the public right-of-way to transition the SCE electrical lines from overhead to underground without using OC San property.  SCE cannot utilize OC San property without an easement.

 

PROPOSED SOLUTION

 

Grant an easement to SCE to relocate the electrical lines underground.

 

TIMING CONCERNS

 

The electrical lines must be relocated before the new headquarters pedestrian bridge can be constructed.  An easement must be granted as soon as possible to allow SCE to complete the relocation and avoid construction delays on the new headquarters building.

 

RAMIFICATIONS OF NOT TAKING ACTION

 

Completion of the new headquarters could be delayed.

 

PRIOR COMMITTEE/BOARD ACTIONS

 

January 2022 - Approved and authorized the General Manager to execute a Facilities Relocation Agreement with Southern California Edison Company for Headquarters Complex at Plant No. 1, Project No. P1-128A, for an amount not to exceed $310,000; and approved a contingency of $31,000 (10%).

 

ADDITIONAL INFORMATION

 

N/A

 

CEQA

 

N/A

 

FINANCIAL CONSIDERATIONS

 

N/A

 

ATTACHMENT

The following attachment(s) may be viewed on-line at the OC San website (www.ocsan.gov) with the complete agenda package:

 

                     Easement

                     Facilities Relocation Agreement (Executed)