File #: 2025-4476    Version: 1 Name:
Type: Consent Status: Passed
File created: 8/27/2025 In control: OPERATIONS COMMITTEE
On agenda: 10/1/2025 Final action: 10/1/2025
Title: PLANT NO. 2 MAIN SEWAGE PUMP #7 OVERHAUL
Sponsors: Riaz Moinuddin
Attachments: 1. Agenda Report
Related files: 2025-4544

FROM:                     Robert Thompson, General Manager

                     Originator: Riaz Moinuddin, Director of Operations & Maintenance 

 

SUBJECT:

 

title

PLANT NO. 2 MAIN SEWAGE PUMP #7 OVERHAUL

end

 

GENERAL MANAGER'S RECOMMENDATION

 

recommendation

RECOMMENDATION:  Recommend to the Board of Directors to:

A.       Approve a Sole Source Purchase Order SSJ#2889 to Bender CCP, Inc. for the overhaul of Main Sewage Pump #7 at Plant No. 2, for a total amount not to exceed $270,942, including applicable sales tax and freight; and

 

B.       Approve a contingency of $27,095 (10%)

body

 

BACKGROUND

 

Orange County Sanitation District’s (OC San) Plant No. 2 Headworks facility has seven Main Sewage Pumps (MSP) that transfer wastewater from the Bar Screen facility to the discharge channel and grit basin.  MSPs #1 through #3 are dedicated to non-reclaimable flows and MSPs #4 through #7 are dedicated to reclaimable flows when operating in separated mode. Plant No. 2 MSPs allow for the treatment of all the wastewater flows that are routed to the plant.

 

RELEVANT STANDARDS

 

                     24/7/365 treatment plant reliability

                     Maintain a proactive asset management program

                     Meet volume and water quality needs for the GWRS

 

PROBLEM

 

MSP #7 was offline for approximately one year to complete Variable Frequency Drive (VFD) repairs.  When the pump was brought back online, it was found to require additional mechanical repairs.  A detailed inspection performed by Bender CCP, Inc., at its facility confirmed the need for multiple repairs and component replacements to restore the pump to reliable service.

 

 

 

 

PROPOSED SOLUTION

 

Approve a Sole Source Purchase Order to Bender CCP, Inc. for the inspection, repair, replacement, and re-assembly of parts for Main Sewage Pump #7 at Plant No. 2.

 

TIMING CONCERNS

 

Given the long lead times of some parts and criticality of these pumps, it is essential to commence this work as soon as possible to ensure operational readiness.

 

RAMIFICATIONS OF NOT TAKING ACTION

 

The Influent Pump Station at Plant No. 2 now has reduced redundancy due to the separation of reclaimable and non-reclaimable flows that pass through this process station.  Insufficient pumping capacity would lead to operating in combined mode, affecting OC San's commitment to supply required flows to the Ground Water Replenishment System.

 

PRIOR COMMITTEE/BOARD ACTIONS

 

N/A

 

ADDITIONAL INFORMATION

 

EBARA is the original equipment manufacturer (OEM), and Bender CCP is EBARA’s recommended local vendor in the Sanitation District’s geographical region. Pricing for the stated repairs of the identified parts is consistent based on previous repairs. A 10% contingency is requested in the event of pricing changes due to tariffs, delays in placing the order beyond quote availability, or other unforeseeable changes.

 

CEQA

 

N/A

 

FINANCIAL CONSIDERATIONS

 

This request complies with the authority levels of OC San’s Purchasing Ordinance.  This item has been budgeted (Budget Update FY 2025-26, Repairs & Maintenance, Page 33) and the budget is sufficient for this action.

Date of Approval

Contract Amount

Contingency

10/22/2025

$270,942

$27,095 (10%)

 

ATTACHMENT

The following attachment(s) may be viewed on-line at the OC San website (www.ocsan.gov) with the complete agenda package:

 

N/A

 

RM:ls