FROM:                     Robert Thompson, General Manager

                     Originator: Mike Dorman, Director of Engineering 

 

SUBJECT:

 

title

POWER BUILDINGS 7 AND 8 HVAC REPLACEMENT AT PLANT NO. 1, PROJECT NO. FE23-08

end

 

GENERAL MANAGER'S RECOMMENDATION

 

recommendation

RECOMMENDATION: 

A.       Approve a Purchase Order and a Master Turnkey Agreement with Trane U.S. Inc. for the Power Buildings 7 and 8 HVAC Replacement at Plant No. 1, Project No. FE23-08, utilizing the OMNIA Partners Cooperative Purchasing Agreement, Contract No. 3341, for a total amount not to exceed $687,708; and

 

B.       Approve a contingency of $34,386 (5%).

body

 

BACKGROUND

 

Orange County Sanitation District’s (OC San) Power Buildings 7 and 8 at Plant No. 1 utilize two heating, ventilation, and air conditioning (HVAC) units to maintain climate control and humidity for critical electrical equipment.  Power Building 7 supplies electrical power to the primary clarifiers and Phys Chem Polymer Station, while Power Building 8 feeds all trickling filters and support equipment.  Both buildings’ units have reached the end of life.

 

RELEVANT STANDARDS

 

                     24/7/365 treatment plant reliability

                     Maintain a proactive asset management program

                     Comply with environmental permit requirements

                     Participate in local, state, and national cooperative purchasing programs

 

PROBLEM

 

The existing HVAC and condensing units have reached the end of their useful life.

 

 

 

 

 

PROPOSED SOLUTION

 

Replace the in-kind HVAC units through a Master Turnkey Agreement with Trane U.S. Inc. utilizing the OMNIA Partners Cooperative Purchasing Agreement Contract No. 3341.  The approval of this Master Turnkey Agreement is a cost-effective way to replace the equipment in a timely manner.

 

TIMING CONCERNS

 

If this action is delayed, OC San will continue to be vulnerable to the loss of electrical equipment within the two buildings that power critical treatment processes.

 

RAMIFICATIONS OF NOT TAKING ACTION

 

Process equipment failures can cause plant disruptions and delays which can lead to regulatory permits compliance issues.

 

PRIOR COMMITTEE/BOARD ACTIONS

 

N/A

 

ADDITIONAL INFORMATION

 

OC San is utilizing a cooperative agreement through OMNIA Partners, formerly U.S. Communities, which is the largest cooperative purchasing organization for public sector procurement.  This agreement was awarded using a competitive bid process similar to OC San’s and has been vetted by the Purchasing Division.  The collective buying power of the unified purchasing cooperatives typically deliver value and savings for public agencies nationwide.

 

Trane U.S. Inc. was selected to propose on this cooperative agreement because they can provide equipment that matches the existing and fits within the existing footprint.  They also provide the equipment at discounts of up to 65% of the list price.

 

Staff evaluated the proposal in accordance with OC San’s policies and procedures and, based on these results, recommends approving the Purchase Order and a Master Turnkey Agreement with Trane U.S. Inc.

 

CEQA

 

The project is exempt from CEQA under the Class 1 categorical exemptions set forth in California Code of Regulations Section 15301.   A Notice of Exemption will be filed with the OC Clerk-Recorder after OC San Board of Directors approval of the Agreement.

 

 

 

 

 

 

 

FINANCIAL CONSIDERATIONS

 

This request complies with the authority levels of OC San’s Purchasing Ordinance.  This item has been budgeted (Budget Update, Fiscal Year 2023-2024, Appendix A-8, Small Construction Projects Program, Project No. M-FE) and the budget is sufficient for the recommended action.

 

Date of Approval

Contract Amount

Contingency

04/24/2024

$687,708

$34,386 (5%)

 

ATTACHMENT

The following attachment(s) may be viewed on-line at the OC San website (www.ocsan.gov) with the complete agenda package:

 

                     Master Turnkey Agreement

 

RM:kp:ls