Legislation Details

File #: 2026-5063    Version: 1 Name:
Type: Consent Status: Final
File created: 8/18/2026 In control: OPERATIONS COMMITTEE
On agenda: 9/2/2026 Final action:
Title: BITTER POINT PUMP STATION MAIN SEWAGE PUMP OVERHAUL
Sponsors: Riaz Moinuddin
Attachments: 1. Agenda Report
Related files: 2025-4421

FROM:                     Robert Thompson, General Manager

                     Originator: Riaz Moinuddin, Director of Operations & Maintenance 

 

SUBJECT:

 

title

BITTER POINT PUMP STATION MAIN SEWAGE PUMP OVERHAUL

end

 

GENERAL MANAGER'S RECOMMENDATION

 

recommendation

RECOMMENDATION: 

A.       Approve a Sole Source Purchase Order to Flo-Services, Inc. for the repair of one Hidrostal Main Sewage Pump for the Bitter Point Pump Station, for a total amount not to exceed $149,755, including applicable sales tax and freight; and

 

B.       Approve a contingency of $29,951 (20%).

body

 

BACKGROUND

 

The Orange County Sanitation District (OC San) operates 15 pump stations within its regional collection system.  The pump stations lift wastewater from low points where a gravity flow system cannot be used and convey wastewater to the treatment plants.

 

The pumps in these stations require routine removal and restoration activities to maintain design capacity and reliability.  These pump stations are critical to the collection system operation and, in the event of the loss of pumping capacity, may result in a backup or sewer spill.

 

RELEVANT STANDARDS

 

                     Achieve less than 2.1 sewer spills per 100 miles

                     Commitment to safety & reducing risk in all operations

                     Protect OC San assets

 

PROBLEM

 

One Main Sewage Pump (MSP) at the Bitter Point Pump Station requires removal from service.  OC San will install the available spare pump to maintain the station’s pumping capacity and operational redundancy.  The removed pump must then be repaired and overhauled to restore it to serviceable condition and replenish OC San’s spare-pump capability for future maintenance needs or equipment failures.

 

PROPOSED SOLUTION

 

Approve a Sole Source Purchase Order to Flo-Services, Inc. to repair and overhaul the removed MSP.  Upon completion, the pump will be returned to OC San’s spare-pump inventory, restoring the availability of a serviceable spare for future planned maintenance or unanticipated pump failures.

 

TIMING CONCERNS

 

Timely completion of the overhaul is necessary to minimize the period during which OC San does not have an available spare MSP for the Bitter Point Pump Station.  Restoring the spare-pump capability will allow OC San to respond promptly to future maintenance needs or equipment failures while maintaining pumping capacity and operational redundancy.

 

Replacement MSPs have long procurement lead times, making it impractical to quickly replace the spare if it is unavailable.

 

RAMIFICATIONS OF NOT TAKING ACTION

 

Not proceeding with the repair would leave OC San without a serviceable spare MSP for the Bitter Point Pump Station.  If an installed pump requires maintenance or experiences an unanticipated failure, the station could have reduced pumping capacity and operational redundancy for an extended period, increasing the risk of a wastewater backup, service disruption, or sewer spill.

 

PRIOR COMMITTEE/BOARD ACTIONS

 

August 2025 - Approved Flo-Services, Inc. as an Original Equipment Manufacturer (OEM) Sole Source provider for Hidrostal Pump Repairs and Services.

 

ADDITIONAL INFORMATION

 

Flo-Services, Inc. is Hidrostal’s sole authorized representative in OC San’s service area and is qualified to perform the required pump repairs.  A 20% contingency is recommended to address additional repairs or replacement components that may be identified after the pump is disassembled and inspected.

 

CEQA

 

N/A

 

FINANCIAL CONSIDERATIONS

 

This request complies with authority levels of OC San’s Purchasing Ordinance.  This item has been budgeted (Budget FY 2026-27 and 2027-28, Section 6, Page 100, Repairs & Maintenance) and the budget is sufficient for the recommended action.

 

Date of Approval

Contract Amount

Contingency

09/02/2026

$149,755

$29,951 (20%)

 

ATTACHMENT

The following attachment(s) may be viewed on-line at the OC San website (www.ocsan.gov) with the complete agenda package:

 

N/A

 