Skip to main content
File #: 2025-4475    Version: 1 Name:
Type: Consent Status: Passed
File created: 8/27/2025 In control: OPERATIONS COMMITTEE
On agenda: 10/1/2025 Final action: 10/1/2025
Title: PROCUREMENT OF COOPER LSVB INTAKE MANIFOLDS
Sponsors: Riaz Moinuddin
Attachments: 1. Agenda Report

FROM:                     Robert Thompson, General Manager

                     Originator: Riaz Moinuddin, Director of Operations & Maintenance 

 

SUBJECT:

 

title

PROCUREMENT OF COOPER LSVB INTAKE MANIFOLDS

end

 

GENERAL MANAGER'S RECOMMENDATION

 

recommendation

RECOMMENDATION: 

A.       Approve a Sole Source Purchase Order to Cooper Machinery Services LLS for the procurement of two spare air intake manifolds for the Central Generation engines at Plant No. 2, for a total amount not to exceed $232,734, including applicable sales tax & freight; and

 

B.       Approve a contingency of $23,274 (10%).

body

 

BACKGROUND

 

The Orange County Sanitation District (OC San) operates five clean-burn internal combustion engines that generate electricity at the Plant No. 2 Central Generation (Cen Gen) facility.  Cen Gen also provides process heat to the digester complex at Plant No. 2. The engines play a vital role in emissions reduction and South Coast Air Quality Management District (SCAQMD) permit compliance by utilizing methane gas produced during the wastewater treatment process.

 

To maximize efficiency and meet emission requirements, Cen Gen components must meet specifications set by the original equipment manufacturer (OEM).  The air intake manifolds are critical components and spares must be inventoried for continued reliable operation.  Air intake manifolds are an integral part of the engine, providing proper air flow into the combustion chambers for proper fuel consumption.  Loss of airflow will create an engine imbalance and cause emission violations.

 

RELEVANT STANDARDS

 

                     24/7/365 treatment plant reliability

                     Maintain a proactive asset management program

                     Operate and maintain facilities to minimize impacts on surrounding communities including odor, noise and lighting

 

PROBLEM

 

OC San currently does not have any spare air intake manifolds in inventory for the Plant No.2 Cen Gen engines.  The existing manifolds have experienced wear and have undergone minor crack repairs.

 

PROPOSED SOLUTION

 

Approve a Sole Source Purchase Order to procure two spare LSVB Air Intake Manifolds for the Cooper Bessemer engines at Plant No. 2 to maintain asset availability and minimize process downtime.

 

TIMING CONCERNS

 

N/A

 

RAMIFICATIONS OF NOT TAKING ACTION

 

Failure to maintain adequate spare parts in inventory could result in extended equipment downtime, affecting electrical power reliability and potentially impair OC San’s ability to maintain operational permit limits. 

 

PRIOR COMMITTEE/BOARD ACTIONS

 

N/A

 

ADDITIONAL INFORMATION

 

Cooper Machinery Services LLC is a Board of Directors approved OEM vendor for all Cen Gen engine components.  A 10% contingency is requested in the event of pricing changes due to tariffs, delays in placing the order beyond valid quote dates, or other unforeseeable changes.

 

CEQA

 

N/A

 

FINANCIAL CONSIDERATIONS

 

This request complies with the authority levels of OC San’s Purchasing Ordinance.  This item has been budgeted (Budget Update FY 2025-26, Page A-18, Lines 870 and 880 Plant Nos. 1 & 2 Maintenance) and the budget is sufficient for this action.

Date of Approval

Contract Amount

Contingency

10/01/2025

$232,734

$23,274 (10%)

 

ATTACHMENT

The following attachment(s) may be viewed on-line at the OC San website (www.ocsan.gov) with the complete agenda package:

 

N/A

 

RM:ls