File #: 2021-1844    Version: 1 Name:
Type: Consent Status: Passed
File created: 9/2/2021 In control: OPERATIONS COMMITTEE
On agenda: 9/29/2021 Final action: 9/29/2021
Title: PLANT NO. 2 PRIMARY DISTRIBUTION STRUCTURE B GATES REPAIR
Sponsors: Rob Thompson
Attachments: 1. Agenda Report, 2. S-2021-1249BD Final Contract and SOW
Related files: 2021-1627
FROM: James D. Herberg, General Manager
Originator: Rob Thompson, Assistant General Manager

SUBJECT:

title
PLANT NO. 2 PRIMARY DISTRIBUTION STRUCTURE B GATES REPAIR
end

GENERAL MANAGER'S RECOMMENDATION

recommendation
RECOMMENDATION:

A. Approve a Service Contract to J.R. Filanc Construction Co. to repair ten slide gates for Plant No. 2 Primary Distribution Structure, per Specification No. S-2021-1249BD, for a total amount not to exceed $309,500, including sales tax and freight; and

B. Approve a contingency of $46,425 (15%).

body
BACKGROUND

The Orange County Sanitation District (OC San) has three primary Distribution Structures at Plant No. 2 that direct primary influent from Headworks to groupings of Primary Sedimentation Basins. Distribution Structure B (DS-B) directs primary influent to primary clarifiers H, I, J, K, L, and M. A condition assessment conducted on DS-B while the six associated primary clarifiers were down during a construction outage identified 10 slide gates that are inoperable and other steel components inside DS-B that are corroded.

RELEVANT STANDARDS

* 24/7/365 treatment plant reliability
* Maintain a proactive asset management program
* Comply with environmental permit requirements

PROBLEM

Major corrosion issues were discovered during the condition assessment performed inside DS-B at Plant No. 2. 10 slide gates were inoperable and severe corrosion was found on numerous steel weir plates and a steel bulkhead. Replacement of these components is required to return DS-B to service.



PROPOSED SOLUTION

Staff recommends replacement of the corroded steel components identified in DS-B at Plant No. 2 through approval of a Purchase Order to the lowest responsive and responsible bidder, J. R. Filanc Construction Co.

TIMING CONCERNS

The proposed repair needs to be executed to restore DS-B and its associated six primary clarifiers to service to restore the rated primary clarification capacity at Plant No. 2. ...