FROM: Robert Thompson, General Manager
Originator: Riaz Moinuddin, Director of Operations & Maintenance
SUBJECT:
title
COLLECTION SYSTEM SPARE PUMP PROCUREMENT FOR THE WESTSIDE AND COLLEGE PUMP STATIONS
end
GENERAL MANAGER'S RECOMMENDATION
recommendation
RECOMMENDATION:
A. Approve a Sole Source Purchase Order to Flo-Systems, Inc. for the purchase of two spare rotating pump assemblies: one rotating assembly for the Westside Pump Station and one rotating assembly for the College Pump Station, for a total amount not to exceed $225,349, including applicable sales tax and freight; and
B. Approve a contingency of $22,535 (10%).
body
BACKGROUND
The Orange County Sanitation District (OC San) operates 15 pump stations within its regional collection system. The pump stations lift wastewater from low points where the gravity flow system cannot be used to transport wastewater to the treatment plants. The pumps in these stations require routine removal and restoration activities to maintain design capacity output due to normal wear and tear. These pump stations are critical to the collection system operation and may result in a backup or sewer spill in the event of losing pumping capacity.
RELEVANT STANDARDS
* Achieve less than 2.1 sewer spills per 100 miles
* Commitment to safety & reducing risk in all operations
* Protect OC San assets
PROBLEM
The main lift pumps at College and Westside Pump Stations require removal for overhauls. However, without spare replacements on hand, this process leads to a temporary loss of pumping capacity. Additionally, the extended lead times in modern supply chains for required overhaul services reduce system redundancy, increasing the risk of service disruptions.
PROPOSED SOLUTION
Approve the purchase of spare rotating pump assemblies from Flo-Systems, Inc. for the Westside and College pump stations to maintain asset availability and minimize operational downtime.
TIMING CONCERNS
The spare pump assemb...