RECOMMENDATION: Recommend to the Board of Directors to:
A. Approve a Purchase Order and a Master Turnkey Agreement with Trane U.S. Inc. for the Power Buildings 7 and 8 HVAC Replacement at Plant No. 1, Project No. FE23-08, utilizing the OMNIA Partners Cooperative Purchasing Agreement, Contract No. 3341, for a total amount not to exceed $687,708; and
B. Approve a contingency of $34,386 (5%).
body
BACKGROUND
Orange County Sanitation District's (OC San) Power Buildings 7 and 8 at Plant No. 1 utilize two heating, ventilation, and air conditioning (HVAC) units to maintain climate control and humidity for critical electrical equipment. Power Building 7 supplies electrical power to the primary clarifiers and Phys Chem Polymer Station, while Power Building 8 feeds all trickling filters and support equipment. Both buildings' units have reached the end of life.
RELEVANT STANDARDS
* 24/7/365 treatment plant reliability
* Maintain a proactive asset management program
* Comply with environmental permit requirements
* Participate in local, state, and national cooperative purchasing programs
PROBLEM
The existing HVAC and condensing units have reached the end of their useful life.
PROPOSED SOLUTION
Replace the in-kind HVAC units through a Master Turnkey Agreement with Trane U.S. Inc. utilizing the OMNIA Partners Cooperative Purchasing Agreement Contract No. 3341. The approval of this Master Turnkey Agreement is a cost-effective way to replace the equipment in a timely manner.
TIMING CONCERNS
If this action is delayed, OC San will continue to be vulnerable to the loss of electrical equipment within the two buildings that power critical treatment processes.
RAMIFICATIONS OF NOT TAKING ACTION
Process equipmen...