File #: 2020-1144    Version: 1 Name:
Type: Consent Status: Passed
File created: 6/22/2020 In control: OPERATIONS COMMITTEE
On agenda: 12/2/2020 Final action: 12/2/2020
Title: SEAL BEACH PUMP STATION ISOLATION VALVE REPLACEMENT, PROJECT NO. FRC-0004
Sponsors: Kathy Millea
Attachments: 1. Agenda Report, 2. S-2020-1198BD Draft Service Contract, 3. File Summary
Related files: 2020-1371
FROM: James D. Herberg, General Manager
Originator: Kathy Millea, Director of Engineering

SUBJECT:

title
SEAL BEACH PUMP STATION ISOLATION VALVE REPLACEMENT, PROJECT NO. FRC-0004
end

GENERAL MANAGER'S RECOMMENDATION

recommendation
RECOMMENDATION: Recommend to the Board of Directors to:

A. Receive and file Bid Tabulation and Recommendation for Seal Beach Pump Station Isolation Valve Replacement, Project No. FRC-0004;

B. Award a Construction Contract to J.R. Filanc Construction Co., Inc. for Seal Beach Pump Station Isolation Valve Replacement, Project No. FRC-0004, in the amount of $466,830; and

C. Approve a contingency of $93,366 (20%).
body

BACKGROUND

The Orange County Sanitation District (Sanitation District) owns and operates the Seal Beach Pump Station which was built in 1972 and is near the end of its useful life. Seal Beach Pump Station Replacement, Project No. 3-67, is now in design, but will not be completed until 2026.

RELEVANT STANDARDS

* Comply with California Public Contract Code Section 20103.8: Award Construction Contract to lowest responsive, responsible bidder
* Achieve less than 2.1 sewer spills per 100 miles
* Ensure the public's money is wisely spent

PROBLEM

To perform pump maintenance and repairs, maintenance crews rely on isolation valves between the wet well and a pump, and between a pump and the discharge header. In this situation, these valves are at the end of their useful life and there is an immediate risk that a valve might fail open, which would prevent a pump from being repaired, or fail close, which would prevent a pump from going back into service. Such a failure in a wet weather event could cause a sewer spill. The poor condition of these valves requires them to be replaced prior to the Seal Beach Pump Station Replacement Project.

PROPOSED SOLUTION

Award a Construction Contract for Seal Beach Pump Station Isolation Valve Replacement, Project No. FRC-0004, to replace 13 isolation...