File #: 2026-4917    Version: 1 Name:
Type: Non-Consent Status: Final
File created: 5/12/2026 In control: OPERATIONS COMMITTEE
On agenda: 12/2/2026 Final action:
Title: COLLEGE PUMP STATION WET WELL REHABILITATION, PROJECT NO. FRC-0020
Sponsors: Mike Dorman
Attachments: 1. Agenda Report, 2. Construction Contract, 3. Presentation
FROM: Robert Thompson, General Manager
Originator: Mike Dorman, Director of Engineering

SUBJECT:

title
COLLEGE PUMP STATION WET WELL REHABILITATION, PROJECT NO. FRC-0020
end

GENERAL MANAGER'S RECOMMENDATION

recommendation
RECOMMENDATION: Recommend to the Board of Directors to:

A. Find that proposed actions are categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301;

B. Receive and file Bid Tabulation and Recommendation for College Pump Station Wet Well Rehabilitation, Project No. FRC-0020;

C. Award a Construction Contract to T.E. Roberts, Inc., for College Pump Station Wet Well Rehabilitation, Project No. FRC-0020, for a total amount not to exceed $4,727,161; and

D. Approve a contingency of $709,074 (15%).
body

BACKGROUND

The Orange County Sanitation District (OC San) operates College Pump Station to convey wastewater through its collection system. The station uses a wet well to collect wastewater before it is pumped through the system.

RELEVANT STANDARDS

Comply with California Public Contract Code Section 20103.8, award construction contract to lowest responsive, responsible bidder
Ensure the public’s money is wisely spent
Sound engineering and accounting practices, complying with local, state and federal laws

PROBLEM

The concrete surfaces and protective lining in the College Pump Station wet well have deteriorated and require repair. Rehabilitation cannot be performed while wastewater is flowing through the wet well, and the pump station must continue operating throughout construction.

PROPOSED SOLUTION

Award a construction contract to rehabilitate the College Pump Station wet well. The contractor will provide temporary bypass pumping to maintain wastewater service while repairing deteriorated concrete and applying a new protective lining. These improvements will help maintain reliable pump station operations.

TIMING CONCERNS

Delaying the rehabilitatio...