File #: 2023-2986    Version: 1 Name:
Type: Non-Consent Status: Passed
File created: 5/8/2023 In control: OPERATIONS COMMITTEE
On agenda: 9/6/2023 Final action: 9/6/2023
Title: EPSA STANDBY POWER GENERATOR CONTROL UPGRADES AT PLANT NO. 2, PROJECT NO. SC19-06
Sponsors: Mike Dorman
Attachments: 1. Agenda Report, 2. Construction Contract, 3. Presentation - SC19-06 EPSA Construction Award
Related files: 2023-3213
FROM: Robert Thompson, General Manager
Originator: Mike Dorman, Director of Engineering

SUBJECT:

title
EPSA STANDBY POWER GENERATOR CONTROL UPGRADES AT PLANT NO. 2, PROJECT NO. SC19-06
end

GENERAL MANAGER'S RECOMMENDATION

recommendation
RECOMMENDATION: Recommend to the Board of Directors to:

A. Receive and file Bid Tabulation and Recommendation for EPSA Standby Power Generator Control Upgrades at Plant No. 2, Project No. SC19-06;

B. Award a Construction Contract to Shimmick Construction Company, Inc. for EPSA Standby Power Generator Control Upgrades at Plant No. 2, Project No. SC19-06, for a total amount not to exceed $3,500,000; and

C. Approve a contingency of $350,000 (10%).
body

BACKGROUND

Orange County Sanitation District (OC San) uses the OOBS and the Effluent Pump Station Annex (EPSA) to pump treated effluent from Plant No. 2 to the ocean through the outfall. In 2008, OC San completed construction of the EPSA Standby Power Facility which contains three 2-megawatt (MW) diesel generators connected to a paralleling 12.47kV switchgear. The EPSA Standby Power Facility supplies emergency backup power to the OOBS and EPSA. There is an ongoing construction contract, J-117B, that is adding a fourth new 2MW diesel generator to the EPSA Standby Power Facility.

RELEVANT STANDARDS

* Comply with California Public Contract Code Section 20103.8, award construction contract to lowest responsive, responsible bidder
* Protect OC San assets

PROBLEM

The protection, control, and monitoring equipment in the EPSA Standby Power Facility is obsolete. These components consist of the generator and feeder protection relays, the digital synchronizer load controllers, generator operator interface panel, voltage regulators, and power monitors. After a recent failure of one of the components, OC San identified that finding replacement parts to restore system functionality was extremely challenging due to obsolescence.

PROPOSED SOLUTION

Award a ...

Click here for full text