File #: 2021-1457    Version: 1 Name:
Type: Consent Status: Passed
File created: 1/25/2021 In control: OPERATIONS COMMITTEE
On agenda: 3/3/2021 Final action: 3/3/2021
Title: PURCHASE OF INVENTORY REPLACEMENT PUMPS FOR PLANT NO. 1 DIGESTER HIGH-RATE PUMPS
Sponsors: Rob Thompson
Attachments: 1. Agenda Report
FROM: James D. Herberg, General Manager
Originator: Rob Thompson, Assistant General Manager

SUBJECT:

title
PURCHASE OF INVENTORY REPLACEMENT PUMPS FOR PLANT NO. 1 DIGESTER HIGH-RATE PUMPS
end

GENERAL MANAGER'S RECOMMENDATION

recommendation
RECOMMENDATION:

A. Approve a Sole Source Purchase Order to Flo-Systems for the purchase of two Hidrostal I16K-SS pumps for Plant No. 1 Digesters, for a total amount not to exceed $158,728, including taxes and freight; and

B. Approve a contingency of $15,873 (10%).
body

BACKGROUND

Digesters stabilize organic solids from primary and secondary treatment processes and produce biosolids and digester gas to fuel the Orange County Sanitation District's (Sanitation District) Central Generation facilities. There are 10 working digesters with two high-rate mix pumps per digester. Both high-rate pumps are needed for proper mixing of the co-thickened sludge at Plant No. 1. Failure of any one pump will result in degradation of the mixing process and loss of gas production.

RELEVANT STANDARDS

* 24/7/365 treatment plant reliability
* Maintain a proactive asset management program
* Maintain a culture of improving efficiency to reduce the cost to provide the current service level or standard

PROBLEM

The requirement to operate two pumps to maintain full operation inhibits the ability to pull pumps for maintenance prior to failure. This leads to long turnaround times, and process outages, for repair due to long lead time parts requirements for these specialty pumps.



PROPOSED SOLUTION

Procure two spare Hidrostal high-rate mix pumps, one clockwise rotation and one counterclockwise rotation, to provide ready spare assets for removal and repair of pumps prior to failures. This will ensure asset availability and maintain proper mixing of the digester sludge. These two assets will serve as replacements for all ten Plant No.1 working digester high-rate pumps.

RAMIFICATIONS OF NOT TAKING ACTION

Failure to obt...