File #: 2023-2734    Version: 1 Name:
Type: Non-Consent Status: Passed
File created: 1/8/2023 In control: ADMINISTRATION COMMITTEE
On agenda: 2/8/2023 Final action: 2/8/2023
Title: PROPOSED ORDINANCE ADOPTING CAPITAL FACILITIES CAPACITY CHARGES
Sponsors: Lorenzo Tyner
Attachments: 1. Agenda Report, 2. Capacity Charge Ordinance (Redlined), 3. Capacity Charge Ordinance (Clean)
Related files: 2022-2681, 2022-2411, 2021-1419, 2021-1741, 2021-1714, 2023-2840, 2023-2807
FROM: James D. Herberg, General Manager
Originator: Lorenzo Tyner, Assistant General Manager

SUBJECT:

title
PROPOSED ORDINANCE ADOPTING CAPITAL FACILITIES CAPACITY CHARGES
end

GENERAL MANAGER'S RECOMMENDATION

recommendation
RECOMMENDATION: Recommend to the Board of Directors to:

A. Motion to read Ordinance No. OC SAN-XX by title only and waive reading of said entire Ordinance;

B. Introduce Ordinance No. OC SAN-XX entitled, "An Ordinance of the Board of the Orange County Sanitation District Adopting Capital Facilities Capacity Charges, and Repealing Ordinance No. OCSD-57"; and

C. Set March 22, 2023 as the date of the Public Hearing to hear protests and for the second reading of Ordinance No. OC SAN-XX.
body

BACKGROUND

The Capital Facilities Capacity Charge (CFCC) is a one-time, non-discriminatory charge imposed at the time a building or structure is newly connected to Orange County Sanitation District's (OC San) system, or an existing structure is expanded or increased. This charge is to pay a portion of the capacity costs and for access to capacity in the system. Based upon the rate study conducted by HDR Engineering, Inc., the Facilities Master Plan, forecasted operating expenses, and cash flow modeling, staff recommends the 3-bedroom base rate for the residential CFCC remain unchanged for Fiscal Year (FY) 2023-24 at $5,719 and will adjust by the Engineering News Record Construction Cost Index each year thereafter.

The non-residential CFCC schedule for FY 2023-24 will decrease by 33% and will adjust by the Engineering News Record Construction Cost Index each year thereafter.

Use Category
FY 2023-24*
Low Demand
$ 242
Average Demand
$1,485
High Demand
$3,521

*per thousand square feet

The Supplemental Capital Facilities Capacity Charges (SCFCC) are fees to Industrial Permittees that exceed their annual baselines for Flow, Biochemical Oxygen Demand (BOD), and Total Suspended Solids (TSS). Flow and BOD will adjust by the E...