File #: 2024-3818    Version: 1 Name:
Type: Non-Consent Status: Passed
File created: 9/5/2024 In control: OPERATIONS COMMITTEE
On agenda: 9/25/2024 Final action: 9/25/2024
Title: PRIMARY CLARIFIERS F AND G ROTATING MECHANISM REHABILITATION AT PLANT NO. 2, PROJECT NO. FE23-09, SPECIFICATION NO. S-2024-612BD
Sponsors: Mike Dorman
Attachments: 1. Agenda Report, 2. Services Contract, 3. Presentation - FE23-09 Services Contract Award
Related files: 2024-3691
FROM: Robert Thompson, General Manager
Originator: Mike Dorman, Director of Engineering

SUBJECT:

title
PRIMARY CLARIFIERS F AND G ROTATING MECHANISM REHABILITATION AT PLANT NO. 2, PROJECT NO. FE23-09, SPECIFICATION NO. S-2024-612BD
end

GENERAL MANAGER'S RECOMMENDATION

recommendation
RECOMMENDATION:

A. Approve a Services Contract to Vicon Enterprise, Inc. for Primary Clarifiers F and G Rotating Mechanism Rehabilitation at Plant No. 2, Project No. FE23-09, Specification No. S-2024-612BD, for a total amount not to exceed $3,150,000; and

B. Approve a contingency of $472,500 (15%).
body

BACKGROUND

The A-side Primary Clarifiers, originally constructed in 1962, consist of four circular clarifiers responsible for treating non-reclaimable flows at Orange County Sanitation District's (OC San) Plant No. 2. Under normal operations, three clarifiers are in service, with the fourth serving as a redundant or backup unit. In February of 2023, Clarifier F failed due to metal loss from corrosion at the connections between the rotating mechanism and center cage structure. An inspection of Clarifier G showed similar levels of corrosion, raising concerns that its rotating mechanism could fail at any time. Consequently, Clarifiers F and G have remained offline since then. The A-Side is currently operating with only Clarifiers D and E in service. A-Side Primary Clarifiers Replacement at Plant No. 2, Contract No. P2-98A, is currently constructing four new A-Side clarifiers due to age and condition, which are expected to be completed by late 2027.

RELEVANT STANDARDS

* Comply with California Public Contract Code Section 20103.8, award construction contract to lowest responsive, responsible bidder
* 24/7/365 treatment plant reliability

PROBLEM

The A-Side clarifiers are currently running with reduced treatment capacity during dry weather operating conditions due to Clarifiers F and G being out of service. Operating less than three primary basins m...

Click here for full text