FROM: Robert Thompson, General Manager
Originator: Riaz Moinuddin, Director of Operations & Maintenance
SUBJECT:
title
PLANT NO. 2 SPARE PLANT WATER PUMP
end
GENERAL MANAGER'S RECOMMENDATION
recommendation
RECOMMENDATION:
A. Approve a Sole Source Purchase Order to G3 Engineering, Inc. for the purchase of one Floway Pump for Plant No. 2 Spare Plant Water Pump for a total amount not to exceed $209,958 plus applicable sales tax and freight charges; and
B. Approve a contingency of $20,996 (10%).
body
BACKGROUND
The Plant Water Pump Station at Orange County Sanitation District (OC San) Plant No. 2 operates four Floway vertical turbine pumps installed under Project No. J-117B. The station distributes treated water throughout the plant, including cooling water for the Central Generation (CenGen) system, supporting critical plant processes and maintenance activities.
RELEVANT STANDARDS
24/7/365 treatment plant reliability
Protect OC San assets
Maintain a proactive asset management program
PROBLEM
OC San does not currently have a spare plant water pump. Failure of an existing pump could result in extended downtime due to the 26-week replacement lead time, potentially impacting CenGen cooling and other critical plant operations.
PROPOSED SOLUTION
Purchase one spare Floway Pump for plant water through G3 Engineering, Inc., the identified authorized distributor, to maintain equipment reliability and minimize downtime following a pump failure.
TIMING CONCERNS
The replacement pump has an estimated 26-week delivery lead time. Delaying procurement increases the risk of prolonged equipment downtime if an existing pump fails.
RAMIFICATIONS OF NOT TAKING ACTION
Without an available spare, a pump failure could result in prolonged equipment downtime, reduced plant water system reliability, and potential interruptions to CenGen cooling and other critical plant processes.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
ADDITIONAL INFORMATION
G3 En...