File #: 2020-1345    Version: 1 Name:
Type: Consent Status: Passed
File created: 11/6/2020 In control: OPERATIONS COMMITTEE
On agenda: 2/3/2021 Final action: 2/3/2021
Title: DIGESTER FERRIC CHLORIDE PIPING REPLACEMENT AT PLANT NO. 1, PROJECT NO. P1-135
Sponsors: Kathy Millea
Attachments: 1. Agenda Report, 2. P1-135 Contract Agreement and Exhibit A Schedule of Prices
Related files: 2021-1480
FROM: James D. Herberg, General Manager
Originator: Kathy Millea, Director of Engineering

SUBJECT:

title
DIGESTER FERRIC CHLORIDE PIPING REPLACEMENT AT PLANT NO. 1, PROJECT NO. P1-135
end

GENERAL MANAGER'S RECOMMENDATION

recommendation
RECOMMENDATION: Recommend to the Board of Directors to:

A. Receive and file Bid Tabulation and Recommendation for Digester Ferric Chloride Piping Replacement at Plant No. 1, Project No. P1-135;

B. Award a Construction Contract to Performance Plumbing & Mechanical Inc., dba PPM Contracting, for Digester Ferric Chloride Piping Replacement at Plant No. 1 for a total amount not to exceed $515,000; and

C. Approve a contingency of $51,500 (10%).

body
BACKGROUND

Digester gas produced by digestion of wastewater sludge in anaerobic digesters contains mostly methane and carbon dioxide, but also hydrogen sulfide that must be limited in concentration to comply with South Coast Air Quality Management District permit conditions associated with the Central Generation co-generation facility. These facilities supply approximately two-thirds of the Orange County Sanitation District's (Sanitation District) power requirements.

Ferric chloride is added to anaerobic digesters to reduce the hydrogen sulfide concentration in the digester gas. To do this, small diameter piping is routed through utility tunnels from an existing digester ferric chloride facility to Anaerobic Digesters 7 through 16.

RELEVANT STANDARDS

* Comply with environmental permit requirements
* Comply with California Public Contract Code Section 20103.8, award construction contract to the lowest responsible bidder



PROBLEM

The existing digester ferric chloride piping is failing and has required repairs in numerous locations due to age and partial blockage.

PROPOSED SOLUTION

Award a Construction Contract for Digester Ferric Chloride Piping Replacement at Plant No. 1, Project No. P1-135. This contract will replace the deteriorated digeste...