File #: 2023-2840    Version: 1 Name:
Type: Public Hearing Status: Passed
File created: 2/23/2023 In control: BOARD OF DIRECTORS
On agenda: 3/22/2023 Final action: 3/22/2023
Title: PROPOSED ORDINANCE NO. OC SAN-59 ADOPTING CAPITAL FACILITIES CAPACITY CHARGES
Sponsors: Lorenzo Tyner
Attachments: 1. Agenda Report, 2. Ordinance No. OC SAN-59
Related files: 2023-2734, 2023-2807, 2024-3547
FROM: Robert Thompson, General Manager
Originator: Lorenzo Tyner, Assistant General Manager

SUBJECT:

title
PROPOSED ORDINANCE NO. OC SAN-59 ADOPTING CAPITAL FACILITIES CAPACITY CHARGES
end

GENERAL MANAGER'S RECOMMENDATION

recommendation
RECOMMENDATION:

A. Conduct a Public Hearing for Capital Facilities Capacity Charges:

* Open Public Hearing
* Receive Public Comment
* Close Public Hearing

B. Motion to read Ordinance No. OC SAN-59 by title only and waive second reading of said entire Ordinance; and

C. Adopt Ordinance No. OC SAN-59, entitled: "An Ordinance of the Board of Directors of the Orange County Sanitation District Adopting Capital Facilities Capacity Charges, and Repealing Ordinance No. OC SAN-57".
body

BACKGROUND

The Capital Facilities Capacity Charge (CFCC) is a one-time, non-discriminatory charge imposed at the time a building or structure is newly connected to Orange County Sanitation District's (OC San) system, or an existing structure is expanded or increased. This charge is to pay a portion of the capacity costs and for access to capacity in the system. Based upon the rate study conducted by HDR Engineering, Inc., the Facilities Master Plan, forecasted operating expenses, and cash flow modeling, staff recommends the 3-bedroom base rate for the residential CFCC remain unchanged for Fiscal Year (FY) 2023-24 at $5,719 and will adjust by the Engineering News Record Construction Cost Index each year thereafter.

The non-residential CFCC schedule for FY 2023-24 will decrease by 33% and will adjust by the Engineering News Record Construction Cost Index each year thereafter.



Use Category
FY 2023-24*
Low Demand
$ 242
Average Demand
$1,485
High Demand
$3,521

*per thousand square feet

The Supplemental Capital Facilities Capacity Charges (SCFCC) are fees to Industrial Permittees that exceed their annual baselines for Flow, Biochemical Oxygen Demand (BOD), and Total Suspended Solids (TSS). Flow and BOD will adjust b...