FROM: Robert Thompson, General Manager
Originator: Mike Dorman, Director of Engineering
SUBJECT:
title
TRUCK LOADING HYDRAULIC POWER UNIT UPGRADES AT PLANT NO. 2, PROJECT NO. FE26-03
end
GENERAL MANAGER'S RECOMMENDATION
recommendation
RECOMMENDATION: Recommend to the Board of Directors to:
A. Approve a Sole Source Purchase Order to Putzmeister America, Inc., for the purchase of four Model HA 55 CI hydraulic power units, two local control panels, and 12 Bosch Rexroth Hydromotors for auger screws for the Truck Loading Hydraulic Power Unit Upgrades at Plant No. 2, Project No. FE26-03 for a total amount not to exceed $1,019,330, including engineering and applicable sales tax and freight; and
B. Approve a contingency of $101,933 (10%).
body
BACKGROUND
The Orange County Sanitation District (OC San) operates the Truck Loading Facility at Plant No. 2 to load biosolid trucks. The facility consists of two truck loading bays, Bay A and Bay B. Each bay has six augers and one sliding frame. The augers and sliding frames are controlled by hydraulic power units and local control panels.
The existing Solid Storage and Truck Loading Facility was constructed in 2000. In 2019, OC San began using centrifuges to remove more water from biosolids before truck loading. The solids content increased from 18-20% to 25-30%.
The existing truck loading system consists of custom-designed Putzmeister equipment. Putzmeister is on the Board-approved Original Equipment Manufacturer (OEM) Sole Source List, approved in May 2020.
RELEVANT STANDARDS
24/7/365 treatment plant reliability
Protect OC San assets
PROBLEM
The hydraulic power units have exceeded their useful life and replacement parts for the local control panels are becoming difficult to obtain. The existing auger motors need to be increased in size to properly accommodate thicker biosolids to prevent high-torque alarms.
PROPOSED SOLUTION
Approve the sole source purchase of replacement h...