Legislation Details

File #: 2025-4183    Version: 1 Name:
Type: Non-Consent Status: Final
File created: 3/11/2025 In control: OPERATIONS COMMITTEE
On agenda: 6/3/2026 Final action:
Title: FULLERTON-PLACENTIA SEWER FACILITIES DEMOLITION AND REHABILITATION, PROJECT NO. 2-73
Sponsors: Mike Dorman
Attachments: 1. Agenda Report, 2. 2-73 PDSA - Draft, 3. Presentation - 2-73 PDSA
FROM: Robert Thompson, General Manager
Originator: Mike Dorman, Director of Engineering

SUBJECT:

title
FULLERTON-PLACENTIA SEWER FACILITIES DEMOLITION AND REHABILITATION, PROJECT NO. 2-73
end

GENERAL MANAGER'S RECOMMENDATION

recommendation
RECOMMENDATION: Recommend to the Board of Directors to:

A. Approve a Professional Design Services Agreement with Kleinfelder, Inc., to provide engineering services for Fullerton-Placentia Sewer Facilities Demolition and Rehabilitation, Project No. 2-73, for an amount not to exceed $2,487,429; and

B. Approve a contingency of $248,743 (10%).
body

BACKGROUND

Orange County Sanitation District (OC San) owns and operates wastewater facilities in the northern portion of the collection system, including the Yorba Linda Pump Station, the Yorba Linda Spur Odor Control Facility, and associated force mains and gravity sewer mains ranging from 12 to 30 inches in diameter. This region is located within the cities of Yorba Linda, Brea, Fullerton, and Placentia.

These facilities were constructed between the 1960s and 2013 to serve the surrounding area and convey wastewater flows to Plant Nos. 1 and 2.

In 2017, OC San completed Project No. 2-72, which upsized the Newhope-Placentia Trunk Sewer and eliminated the need for the Yorba Linda Pump Station to divert flows from undersized gravity sewer mains.

RELEVANT STANDARDS

* Comply with California Government Code Section 4526 to engage the best qualified firm "on the basis of demonstrated competence and qualifications" and "negotiate fair and reasonable fees"
* Protect OC San assets
* Maintain a proactive asset management program


PROBLEM

The Yorba Linda Pump Station constructed in 1974 has reached the end of its useful life, and is no longer necessary following completion of Project No. 2-72, Newhope-Placentia Trunk Replacement. The easement agreement with California State University Fullerton (CSUF) requires OC San to vacate the easement and restore ...