Title: CENGEN OIL FILTERS PLATFORM AT PLANT NO. 1 AND PLANT NO. 2, PROJECT NO. SC17-03
Sponsors: Kathy Millea
Attachments: 1. Agenda Report, 2. SC17-03 Construction Contract Agreement Package, 3. File Summary

FROM:                     James D. Herberg, General Manager

                     Originator: Kathy Millea, Director of Engineering 

 

SUBJECT:

 

title

CENGEN OIL FILTERS PLATFORM AT PLANT NO. 1 AND PLANT NO. 2, PROJECT NO. SC17-03

end

 

GENERAL MANAGER'S RECOMMENDATION

recommendation

 

RECOMMENDATION:

A.       Receive and file Bid Tabulation and Recommendation for CenGen Oil Filters Platform at Plant No. 1 and Plant No. 2, Project No. SC17-03;

 

B.       Award a Construction Contract to Houalla Enterprises, Ltd., dba Metro Builders & Engineers Group, Ltd., for CenGen Oil Filters Platform at Plant No. 1 and Plant No. 2, Project No. SC17-03, for an amount not to exceed $134,480; and

 

C.       Approve a contingency of $13,448 (10%).

body

 

BACKGROUND

 

There are three Central Generation engines at Plant No. 1 and five at Plant No. 2.  The oil lubrication system for each of the engines includes two 30-inch diameter canister filters.  Replacing the filters requires lifting the five-foot tall filters from the top of the canisters, which are approximately seven feet above the floor.  Access is both difficult and awkward, requiring personal protective fall prevention equipment.

 

RELEVANT STANDARDS

 

                     Comply with California Public Contract Code Section 20103.8: Award construction to lowest responsive, responsible bidder

                     Maintain a proactive asset management program

                     Provide a safe and collegial workplace

 

PROBLEM

 

Since the canister filters are located above piping, staff cannot use a ladder or scaffolding to access the top of the canisters to replace the filters.

 

 

PROPOSED SOLUTION

 

Award a construction contract for CenGen Oil Filters Platform at Plant No. 1 and Plant No. 2, Project No. SC17-03.  This project will provide for work platforms to more safely access and replace the filters.

 

TIMING CONCERNS

 

Delaying the work will extend the period when the filters are more difficult to access.

 

RAMIFICATIONS OF NOT TAKING ACTION

 

Replacing the filters would continue to require staff to access the top of the canisters with cumbersome personal protective equipment rather than an engineered access platform.

 

PRIOR COMMITTEE/BOARD ACTIONS

 

N/A

 

ADDITIONAL INFORMATION

 

The Orange County Sanitation District (Sanitation District) advertised Project No. SC17-03 for bids on September 4, 2019 and five sealed bids were received on October 15, 2019.  A summary of the bid opening follows:

 

Engineer’s Estimate

$ 129,000

 

 

Bidder

Amount of Bid

Metro Builders & Engineers Group, Ltd.

$ 134,479.22

J. R. Filanc Construction

$ 179,611.00

MMC, Inc.

$ 254,000.00

RAM Mechanical

$ 268,644.00

Innovative Construction Solutions

$ 350,000.00

 

The bids were evaluated in accordance with the Sanitation District’s policies and procedures.  A notice was sent to all bidders on November 7, 2019 informing them of the intent of Sanitation District staff to recommend award of the Construction Contract to Houalla Enterprises, Ltd. dba Metro Builders & Engineers Group, Ltd.

 

Staff recommends awarding a construction contract to the lowest responsive bidder, Metro Builders & Engineers Group, Ltd., for a total amount not to exceed $134,480.

 

CEQA

 

This project is exempt from CEQA under the Class 1 categorical exemptions set forth in California Code of Regulations Sections 15301 because the project involves repairs, replacement, and/or minor alteration of the existing facilities involving no expansion of use or capacity.  A Notice of Exemption will be filed with the OC Clerk-Recorder after the Sanitation District’s Board of Directors approval of the CenGen Oil Filters Platform at Plant No. 1 and Plant No. 2, Project No. SC17-03.

 

FINANCIAL CONSIDERATIONS

 

This request complies with authority levels of the Sanitation District’s Purchasing Ordinance.  This recommendation will be funded under the Operations & Maintenance Capital Program, Project No.   M-SM-CAP (FY 2019-20 Budget Update, Appendix A, Page A-8).  The budget is sufficient for the recommended action.

 

ATTACHMENT

The following attachment(s) may be viewed on-line at the OCSD website (www.ocsd.com) with the complete agenda package:

 

                     Construction Contract

 