File #: 2019-677    Version: 1 Name:
Type: Non-Consent Status: Passed
File created: 10/11/2019 In control: BOARD OF DIRECTORS
On agenda: 1/22/2020 Final action: 1/22/2020
Title: HEADWORKS MODIFICATIONS AT PLANT NO. 2 FOR GWRS FINAL EXPANSION, PROJECT NO. P2-122
Sponsors: Kathy Millea
Attachments: 1. Agenda Report, 2. P2-122 Contract Agreement Package
FROM: James D. Herberg, General Manager
Originator: Kathy Millea, Director of Engineering

SUBJECT:

title
HEADWORKS MODIFICATIONS AT PLANT NO. 2 FOR GWRS FINAL EXPANSION, PROJECT NO. P2-122
end

GENERAL MANAGER'S RECOMMENDATION

recommendation
RECOMMENDATION: Recommend to the Board of Directors to:

A. Receive and file Bid Tabulation and Recommendation for Headworks Modifications at Plant No. 2 for GWRS Final Expansion, Project No. P2-122;

B. Award a Construction Contract to Shimmick Construction Co., Inc. for Headworks Modifications at Plant No. 2 for GWRS Final Expansion, Project No. P2-122, for a total amount not to exceed $14,487,735; and

C. Approve a contingency of $1,448,773 (10%).
body

BACKGROUND

Sewage from four trunk lines is blended in the Orange County Sanitation District's (Sanitation District) Plant No. 2 Headworks. One of the trunk lines is non-reclaimable because it includes flows from the Santa Ana River Interceptor and non-reclaimable side streams generated at Plant No. 1 and the Orange County Water District (OCWD). Several Plant No. 2 side streams are also non-reclaimable.

This project is necessary for the final expansion of the Groundwater Replenishment System (GWRS) and will be reimbursed by OCWD per an existing agreement dated March 2019.

RELEVANT STANDARDS

* Meet volume and water quality needs for the GWRS
* Use all practical and effective means for resource recovery
* Comply with California Public Contract Code Section 20103.8, award construction contract to lowest responsible bidder



PROBLEM

Reclaimable and non-reclaimable flows are currently combined in the Plant No. 2 Headworks, which makes all of Plant No. 2 effluent non-reclaimable. To recover reclaimable flows, the two streams must be separated.

PROPOSED SOLUTION

Award a Construction Contract for Headworks Modifications at Plant No. 2 for GWRS Final Expansion, Project No. P2-122. This contract will modify the Headworks by installing new gates and a diversi...