FROM: James D. Herberg, General Manager
Originator: Kathy Millea, Director of Engineering
SUBJECT:
title
HEADWORKS EXPLOSIVE GAS MONITORING SYSTEMS AT PLANT NOS. 1 AND 2, PROJECT NO. FE18-11
end
GENERAL MANAGER'S RECOMMENDATION
recommendation
RECOMMENDATION: Recommend to the Board of Directors to:
A. Receive and file Bid Tabulation and Recommendation for Headworks Explosive Gas Monitoring Systems at Plant Nos. 1 and 2, Project No. FE18-11;
B. Ratify withdrawal of low bid from RP Controls at its request due to an inadvertent bid error and omission made by RP Controls and its equipment supplier regarding the contract design requirements and return of its bid security as allowed under Public Contract Code ?5100 et seq.;
C. Award Construction Contract to Baker Electric, Inc. for Headworks Explosive Gas Monitoring Systems at Plant Nos. 1 and 2, Project No. FE18-11, for a total amount not to exceed $223,984; and
D. Approve a contingency of $22,398 (10%).
body
BACKGROUND
Headworks facilities at Orange County Sanitation District (Sanitation District) Plant Nos. 1 and 2 remove large pieces of trash and debris that would otherwise damage downstream treatment equipment. On occasion, combustible gas or hydrocarbon vapor in the incoming wastewater accumulates in the Headworks building. These gases pose a danger to staff and facilities if their concentration exceeds their lower explosive limit.
RELEVANT STANDARDS
* Comply with California Public Contract Code Section 20103.8, award construction contract to lowest responsive, responsible bidder
* Commitment to safety & reducing risk in all operations
PROBLEM
Explosive gases can accumulate in the Headworks and would not be detected.
PROPOSED SOLUTION
Award a Construction Contract for Headworks Explosive Gas Monitoring Systems at Plant Nos. 1 and 2, Project No. FE18-11, to install explosive gas monitoring systems at each plant. This system will provide an early warning of a po...
Click here for full text