File #: 2020-963    Version: 1 Name:
Type: Consent Status: Passed
File created: 3/5/2020 In control: OPERATIONS COMMITTEE
On agenda: 3/25/2020 Final action: 3/25/2020
Title: HEADWORKS EXPLOSIVE GAS MONITORING SYSTEMS AT PLANT NOS. 1 AND 2, PROJECT NO. FE18-11
Sponsors: Kathy Millea
Attachments: 1. Agenda Report, 2. FE18-11 Final Contract Agreement, 3. File Summary
Related files: 2019-632
FROM: James D. Herberg, General Manager
Originator: Kathy Millea, Director of Engineering

SUBJECT:

title
HEADWORKS EXPLOSIVE GAS MONITORING SYSTEMS AT PLANT NOS. 1 AND 2, PROJECT NO. FE18-11
end

GENERAL MANAGER'S RECOMMENDATION

recommendation
RECOMMENDATION:

A. Receive and file Bid Tabulation and Recommendation for Headworks Explosive Gas Monitoring Systems at Plant Nos. 1 and 2, Project No. FE18-11;

B. Ratify withdrawal of low bid from RP Controls at its request due to an inadvertent bid error and omission made by RP Controls and its equipment supplier regarding the contract design requirements and return of its bid security as allowed under Public Contract Code ?5100 et seq.;

C. Award Construction Contract to Baker Electric, Inc. for Headworks Explosive Gas Monitoring Systems at Plant Nos. 1 and 2, Project No. FE18-11, for a total amount not to exceed $223,984; and

D. Approve a contingency of $22,398 (10%).
body

BACKGROUND

Headworks facilities at Orange County Sanitation District (Sanitation District) Plant Nos. 1 and 2 remove large pieces of trash and debris that would otherwise damage downstream treatment equipment. On occasion, combustible gas or hydrocarbon vapor in the incoming wastewater accumulates in the Headworks building. These gases pose a danger to staff and facilities if their concentration exceeds their lower explosive limit.

RELEVANT STANDARDS

* Comply with California Public Contract Code Section 20103.8, award construction contract to lowest responsive, responsible bidder
* Commitment to safety & reducing risk in all operations


PROBLEM

Explosive gases can accumulate in the Headworks and would not be detected.

PROPOSED SOLUTION

Award a Construction Contract for Headworks Explosive Gas Monitoring Systems at Plant Nos. 1 and 2, Project No. FE18-11, to install explosive gas monitoring systems at each plant. This system will provide an early warning of a potential hazard, such as combustible liqui...

Click here for full text