File #: 2020-1045    Version: 1 Name:
Type: Consent Status: Passed
File created: 4/16/2020 In control: OPERATIONS COMMITTEE
On agenda: 5/6/2020 Final action: 5/6/2020
Title: MAINTENANCE COATING OF EFFLUENT JUNCTION BOX PIPING
Sponsors: Rob Thompson
Attachments: 1. Agenda Report, 2. File Summary
FROM: James D. Herberg, General Manager
Originator: Rob Thompson, Assistant General Manager

SUBJECT:

title
MAINTENANCE COATING OF EFFLUENT JUNCTION BOX PIPING
end

GENERAL MANAGER'S RECOMMENDATION

recommendation
RECOMMENDATION:

A. Approve a Purchase Order Contract with Abhe & Svoboda, Inc. for the maintenance coating of the pipes and associated support structure at the Effluent Junction Box, per specification S-2020-1146BD, for a total amount not to exceed $135,732; and

B. Approve a contingency of $27,146 (20%).
body

BACKGROUND

The Effluent Junction Box (EJB), located just outside Plant No. 1, is a critical structure through which the effluent from Plant No. 1 and brine from the Groundwater Replenishment System (GWRS) are routed to Plant No. 2 for ocean discharge. The EJB was constructed in 1989 and includes underground vaults through which steel effluent pipelines enter and exit the structure.

RELEVANT STANDARDS

* 24/7/365 treatment plant reliability
* Comply with environmental permit requirements
* Maintain a proactive asset management program

PROBLEM

The external coating on the steel piping and its associated support structures in the EJB pipe vaults has deteriorated and a maintenance coating of these elements is required to prevent deterioration of the pipeline integrity.

PROPOSED SOLUTION

Perform repair coatings on the 66-inch north and south pipes, 84-inch north and south pipes, two 108-inch west pipes, associated actuators and stems, and associated support brackets and surfaces in and above the underground vaults.

TIMING CONCERNS

Due to the deterioration of the pipeline protective coatings, the EJB piping and its support structures in the underground vaults are subject to corrosion due to adverse environmental conditions and incidental water intrusion into the vaults.

RAMIFICATIONS OF NOT TAKING ACTION

Failure or a significant delay to repair the coatings for the pipes and their associated support structures in the v...

Click here for full text