File #: 2020-1077    Version: 1 Name:
Type: Consent Status: Passed
File created: 5/11/2020 In control: OPERATIONS COMMITTEE
On agenda: 6/3/2020 Final action: 6/3/2020
Title: 12KV DISTRIBUTION CENTER B AND EAST RAS PUMP STATION ROOFING REPLACEMENT, PROJECT NO. FE18-19R
Sponsors: Kathy Millea
Attachments: 1. Agenda Report, 2. Draft FE18-19R Contract, 3. File Summary
Related files: 2019-828, 2020-1106
FROM: James D. Herberg, General Manager
Originator: Kathy Millea, Director of Engineering

SUBJECT:

title
12KV DISTRIBUTION CENTER B AND EAST RAS PUMP STATION ROOFING REPLACEMENT, PROJECT NO. FE18-19R
end

GENERAL MANAGER'S RECOMMENDATION

recommendation
RECOMMENDATION: Recommend to the Board of Directors to:

A. Receive and file Bid Tabulations and Recommendation for O'Connell Engineering & Construction, Inc. for 12kV Distribution Center B and East RAS Pump Station Roofing Replacement, Project No. FE18-19R;

B. Award a Construction Contract to O'Connell Engineering & Construction, Inc. for 12kV Distribution Center B and East RAS Pump Station Roofing Replacement, Project No. FE18-19R, for a total amount not to exceed $674,800; and

C. Approve a contingency of $67,480 (10%).
body

BACKGROUND

The 12kV Distribution Center B and East RAS Pump Station buildings provide electrical power to critical operating facilities at the Orange County Sanitation District (Sanitation District) Plant No. 2.

RELEVANT STANDARDS

* Comply with California Public Contract Code Section 20103.8, award construction contract to lowest responsive, responsible bidder
* Maintain a proactive asset management program
* Protect Orange County Sanitation District assets

PROBLEM

The 12kV Distribution Center B and East RAS Pump Station buildings were built in 1977 and are currently experiencing roof leaks. Staff has been protecting electrical equipment using temporary measures.


PROPOSED SOLUTION

Award 12kV Distribution Center B and East RAS Pump Station Roofing Replacement, Project No. FE18-19R. This project will replace the roofing on two buildings, repair cracks on the concrete roof structure, and other related improvements.

TIMING CONCERNS

Delaying the construction contract will directly lengthen the time that a leaking roof could cause damage to electrical equipment.

RAMIFICATIONS OF NOT TAKING ACTION

Electrical equipment will continue to be at risk of d...