File #: 2024-3557    Version: 1 Name:
Type: Non-Consent Status: Passed
File created: 4/4/2024 In control: OPERATIONS COMMITTEE
On agenda: 4/24/2024 Final action: 4/24/2024
Title: LOS ALAMITOS SUB-TRUNK AND WESTSIDE RELIEF INTERCEPTOR REHABILITATION, PROJECT NO. 3-64C
Sponsors: Mike Dorman
Attachments: 1. Agenda Report, 2. Agreement, 3. Presentation - Project No. 3-64C Forest Lawn Agreement
Related files: 2024-3490
FROM: Robert Thompson, General Manager
Originator: Mike Dorman, Director of Engineering

SUBJECT:

title
LOS ALAMITOS SUB-TRUNK AND WESTSIDE RELIEF INTERCEPTOR REHABILITATION, PROJECT NO. 3-64C
end

GENERAL MANAGER'S RECOMMENDATION

recommendation
RECOMMENDATION:

Approve an agreement with Forest Lawn Memorial-Park Association for construction access and staging, sewer installation, and pavement rehabilitation in coordination with the Los Alamitos Sub-Trunk and Westside Relief Interceptor Rehabilitation, Project No. 3-64C for an amount payable to Orange County Sanitation District not to exceed $813,000.
body

BACKGROUND

The Orange County Sanitation District (OC San) is rehabilitating the Los Alamitos Sub-Trunk in the city of Cypress by replacing the existing 18-inch sewer with a new, larger 26-inch sewer pipeline in the same alignment. OC San currently has an easement with Forest Lawn Memorial-Park Association (FLMPA) for the portion of the alignment that traverses FLMPA's property. This part of the project will upsize the pipe using both open cut and trenchless methods, replace manholes to accommodate the new larger pipe, and repave the area above the pipe and manholes.

RELEVANT STANDARDS

* Maintain collaborative and cooperative relationships with regulators, stakeholders, and neighboring communities
* Maintain a proactive asset management program

PROBLEM

FLMPA has asked OC San to add sewer stub outs and pavement beyond what is required for the project, which will result in additional construction costs. OC San's proposed sewer construction requires a temporary construction easement and staging area from FLMPA to perform the work.




PROPOSED SOLUTION

Approve an agreement with FLMPA for the Los Alamitos Sub-Trunk and Westside Relief Interceptor Rehabilitation, Project No. 3-64C, to reimburse OC San for the additional project scope requested by FLMPA. The exact reimbursement cost will be based on the bid price of the requested work. This agre...

Click here for full text